Get Custom Roofing Truck Decks from Calgary’s Leading Fabrication Shop

Strong, reliable decks designed for shingle hauling and boom truck use. Built for safety, jobsite efficiency and long term durability.

GET A QUOTE FOR YOUR project

GET A QUOTE ›

how we deck out your roofing truck

SEE how we do it ›

see roofing trucks we've done

SEE PROJECT GALLERY ›

What to Expect

What to expect when we fabricate a custom deck for your roofing truck

Roofing trucks work hard. They haul shingles and make daily deliveries to multiple jobsites. They must often operate cranes or conveyors.

When you trust Core Fabrication Inc. to deliver a custom deck, our process ensures a final product that is built to handle the abuse:

Initial
Consultation

We meet with you to review your chassis, boom or conveyor system and typical shingle or material loads so we can design a deck that keeps your crew productive.

DESIGN PROCESS

Our drafting team creates a reinforced deck layout with proper tie down placement, boom clearance and safe walkable surfaces for crew access.

PRECISION FABRICATIONS

CWB certified welders fabricate and assemble the deck in house, integrating outrigger mounts, ladder racks, and custom tool storage as needed.

FINAL INSPECTION & DELIVERY

Your deck is weighed, certified and given the National Safety Mark for CMVSS compliance before pickup. When you pick up your truck, it’s ready for the next job.

If you have any questions or need help, feel free to contact our team, or you can call us any time (403) 998-5169

ABOUT US

Serving customers across North America

Our vertically integrated Calgary facility handles design, welding, hydraulics, electrics and finishing all under one roof. This means no subcontractor delays and a faster turnaround for your roofing deck builds.
Map of North America

Projects

Engineered and completed for roofing suppliers, shingle haulers and construction fleets across Canada and the Northern U.S.

Clients

Trusted by businesses across Canada and the northern U.S. for reliable builds.

Great business to work with. They dealt with modifications on the fly and worked with me to make sure my requirements were met. They did a beautiful job, couldn’t be happier. Tell them what you need and let them do what they do best. You won’t be disappointed!

See more reviews

GALLERY

roofing truck GALLERY

We build custom truck decks that keep roofing projects moving

SHINGLE DELIVERY TRUCKS

Reinforced decks with tie down points and space for conveyors or booms.

ROOFING FLEET BUILDS

Standardized designs across multiple trucks for consistent performance and easier training.

MIXED USE DECKS

Decks designed for hauling shingles, underlayment and equipment on the same route.

WE ARE ALWAYS READY TO HELP YOU

MORE INFORMATION

Roofing Truck Deck FAQs

Find detailed answers to the questions we hear most often about building a custom roofing truck deck with Core Fabrication.

Can you design a deck for the roofing materials I haul most often?

Yes. We start by looking at the materials you transport (shingles, rolls, metal panels, tiles, etc.) and build the deck to support their weight and size. We also design the layout so loads can be strapped and unloaded quickly.

What options do I have for organizing tools and equipment?

Our team can build a custom deck for practically anything roofing trucks need. We can integrate ladder racks, material racks and secure toolboxes directly into the deck. This keeps tools organized, reduces clutter and saves time when crews are loading or working on site.

How do you make sure the deck can handle the weight of roofing loads?

We calculate total load weight, including materials, ladders and tools. Then we engineer the deck frame to exceed those requirements. Every build is weighed and certified for CMVSS compliance so you know it’s safe to run fully loaded.

What materials do you recommend for roofing truck decks?

Most roofing operators choose heavy duty steel for maximum strength and longevity. We may also offer aluminum for lighter builds to improve fuel efficiency if appropriate and requested.

Can you add extra tie down points for securing shingles and equipment?

Absolutely. We strategically place welded tie downs along the deck so crews can strap down pallets, bundles and tools safely and prevent load shifting in transit.

Can you integrate safety features like lighting and storage for PPE?

Yes. We often add LED work lights and beacons. We can also add designated storage for safety gear like cones, harnesses and vests. This helps keep your crews compliant and protected.

What’s the typical turnaround time for a roofing deck build?

Smaller builds are typically completed in 2 to 4 weeks. Larger projects with multiple integrated features may take 4 to 6 weeks. We give you a clear schedule and progress updates so you can plan your work without disruptions.